Fairwater Atlanta (QTS facility and Microsoft tenant; Fayetteville, Georgia, US) has no dated promise on the record; at the end-of-August 2026 reading the public record evidences 636 MW of IT load against 636 MW announced or estimated. The book’s verdict: never dated.

From The AI Compute Race. Read the book

Download this campus: CSV · JSON

Announced or estimated (IT load)636 MW
Evidenced power (IT load), end of August 2026636 MW
The book’s verdictNever dated

The ledger’s reading is the end of August 2026: the promises and the states as they stood then. Each row’s evidence carries its own date, printed on it.

The promise and the record, on one line. The book’s verdict: Never dated.
  • Evidence read
  • Today

636 MW evidenced at the end-of-August 2026 reading, of 636 MW announced or estimated (100%).

The announcement

Announced or estimated capacity (IT load)
636 MW
Where the announcement was read
epoch.ai
When it was read

The promise

What was promised
none

At the close of the record

Evidenced power (IT load), end of August 2026
636 MW
Where the evidence was read
epoch.ai
When it was read
The book’s verdict
Never dated

The book’s note

The August 2026 compilation’s dates (buildings 1–2 Oct 2025, full Jun 2026, achieved) are its operating record; no promoter’s prior first-power date is held. A Microsoft announcement dated before operation would make this a dated row.

Also

Who is involved

Campuses near it in the ledger

Questions about this campus

Is Fairwater Atlanta energized?
Fairwater Atlanta (QTS facility and Microsoft tenant; Fayetteville, Georgia, US) has no dated promise on the record; at the end-of-August 2026 reading the public record evidences 636 MW of IT load against 636 MW announced or estimated. The book’s verdict: never dated.
When was Fairwater Atlanta promised to be energized?
The record holds no dated promise for Fairwater Atlanta.
Who is building Fairwater Atlanta?
QTS (Blackstone) (owner), Microsoft (tenant).
How to cite this page

Dryburgh, Lee S. “Fairwater Atlanta.” In The AI Compute Race. DRYBURGH. https://dryburgh.com/vol1/ledger/fairwater-atlanta (accessed 2026-11-01).

BibTeX

@misc{dryburgh-fairwater-atlanta-2026,
  author = {Dryburgh, Lee S.},
  title = {{Fairwater Atlanta}},
  howpublished = {In \emph{The AI Compute Race}, DRYBURGH},
  year = {2026},
  url = {https://dryburgh.com/vol1/ledger/fairwater-atlanta},
  note = {Accessed 2026-11-01}
}

For a reference manager: RIS · CSL-JSON