The AI Compute Race Campuses Campus 38 of 40

Nebius Vineland (DataOne; Nebius; Microsoft capacity buyer), Vineland, New Jersey, US

DataOne (owner); Nebius (operator); Microsoft capacity buyer

Nebius Vineland (DataOne, Nebius and Microsoft capacity buyer; Vineland, New Jersey, US) was promised operations by 30 June 2025; at the end-of-August 2026 reading the public record evidences 50 MW of IT load. The book’s verdict: slipped.

From The AI Compute Race. Read the book

Download this campus: CSV · JSON

Announced or estimated (IT load)not on file
Evidenced power (IT load), end of August 202650 MW
The book’s verdictSlipped

The ledger’s reading is the end of August 2026: the promises and the states as they stood then. Each row’s evidence carries its own date, printed on it.

The promise and the record, on one line. The book’s verdict: Slipped.
  • Promised
  • Evidence read
  • Today

The announcement

Announced or estimated capacity (IT load)
not on file
Where the announcement was read
nebius.com
When it was read

The promise

Promised by
What was promised
operations
Where the promise was read
nebius.com

At the close of the record

Evidenced power (IT load), end of August 2026
50 MW
Where the evidence was read
epoch.ai
When it was read
The book’s verdict
Slipped

The book’s note

Up to 300 MW is a facility design figure, not IT, so the row adds nothing to the announced total while its 50 MW is in the energized total. Additional capacity promised by end-Q2 2025; the first 50 MW evidenced 28 Feb 2026, about eight months late (the August 2026 compilation slip 5, original scope ambiguous).

Also

Who is involved

Campuses near it in the ledger

Questions about this campus

Is Nebius Vineland energized?
Nebius Vineland (DataOne, Nebius and Microsoft capacity buyer; Vineland, New Jersey, US) was promised operations by 30 June 2025; at the end-of-August 2026 reading the public record evidences 50 MW of IT load. The book’s verdict: slipped.
When was Nebius Vineland promised to be energized?
Nebius Vineland was promised operations by 30 June 2025.
Who is building Nebius Vineland?
DataOne (owner), Nebius (operator), Microsoft (offtaker).
How to cite this page

Dryburgh, Lee S. “Nebius Vineland.” In The AI Compute Race. DRYBURGH. https://dryburgh.com/vol1/ledger/nebius-vineland (accessed 2026-11-01).

BibTeX

@misc{dryburgh-nebius-vineland-2026,
  author = {Dryburgh, Lee S.},
  title = {{Nebius Vineland}},
  howpublished = {In \emph{The AI Compute Race}, DRYBURGH},
  year = {2026},
  url = {https://dryburgh.com/vol1/ledger/nebius-vineland},
  note = {Accessed 2026-11-01}
}

For a reference manager: RIS · CSL-JSON