The AI Compute Race Campuses Campus 1 of 40

PORTS-Pike (SB Energy; OpenAI), Pike County, Ohio, US

SB Energy (landlord); OpenAI (tenant)

PORTS-Pike (SB Energy and OpenAI; Pike County, Ohio, US) was promised first power by 31 December 2028; at the end-of-August 2026 reading the public record evidences 0 MW of IT load against 8,000 MW announced or estimated. The book’s verdict: not yet due.

From The AI Compute Race. Read the book

Download this campus: CSV · JSON

Announced or estimated (IT load)8,000 MW
Evidenced power (IT load), end of August 20260 MW
The book’s verdictNot yet due

The ledger’s reading is the end of August 2026: the promises and the states as they stood then. Each row’s evidence carries its own date, printed on it.

The promise and the record, on one line. The book’s verdict: Not yet due.
  • Evidence read
  • Today
  • Promised

0 MW evidenced at the end-of-August 2026 reading, of 8,000 MW announced or estimated (0%).

The announcement

Announced or estimated capacity (IT load)
8,000 MW
Where the announcement was read
openai.com
When it was read

The promise

Promised by
What was promised
first power
Where the promise was read
openai.com

At the close of the record

Evidenced power (IT load), end of August 2026
0 MW
Where the evidence was read
sec.gov
When it was read
The book’s verdict
Not yet due

The book’s note

The first 800 MW targeted for 2028 (a bare year, read to 31 December). SB Energy’s S-1 counts none of its IT capacity operating and its construction outside Ohio. Slippage matrix row 3.

Also

Who is involved

Filings that bear on it

Campuses near it in the ledger

Questions about this campus

Is PORTS-Pike energized?
PORTS-Pike (SB Energy and OpenAI; Pike County, Ohio, US) was promised first power by 31 December 2028; at the end-of-August 2026 reading the public record evidences 0 MW of IT load against 8,000 MW announced or estimated. The book’s verdict: not yet due.
When was PORTS-Pike promised to be energized?
PORTS-Pike was promised first power by 31 December 2028.
Who is building PORTS-Pike?
SB Energy (owner), OpenAI (tenant).
How to cite this page

Dryburgh, Lee S. “PORTS-Pike.” In The AI Compute Race. DRYBURGH. https://dryburgh.com/vol1/ledger/ports-pike (accessed 2026-11-01).

BibTeX

@misc{dryburgh-ports-pike-2026,
  author = {Dryburgh, Lee S.},
  title = {{PORTS-Pike}},
  howpublished = {In \emph{The AI Compute Race}, DRYBURGH},
  year = {2026},
  url = {https://dryburgh.com/vol1/ledger/ports-pike},
  note = {Accessed 2026-11-01}
}

For a reference manager: RIS · CSL-JSON