Two of the forty campuses in the ledger are in Tennessee. Two of them carry an announced or estimated capacity, 1,871 MW in all. The record evidences 1,286 MW across the two, at the end-of-August 2026 reading.
1 slipped · 1 kept
From The AI Compute Race. Read the book
The campuses
| Campus | Where | Announced or estimated capacity (IT load) | Evidenced power (IT load) | The book’s verdict |
|---|---|---|---|---|
| Colossus 2 | Memphis, Tennessee, and Southaven, Mississippi, US | 1,531 MW | 946 MW | Slipped |
| Colossus 1 | Memphis, Tennessee, US | 340 MW | 340 MW | Kept |
Who is involved
- xAI (SpaceXAI) 2 of 2
- Anthropic 1 of 2
Every figure is the campus page’s own, read at the end of August 2026; each campus page carries its sources. Places · All 40 campuses.