The test. By 31 December 2028, two consecutive years of falling energized additions (2027 and 2028), cancellations of financed blocks, downgrades below investment grade for a hyperscaler or a neocloud default, and shutdowns ordered rather than negotiated.
open Open. Oracle sits one notch above the investment-grade floor after S&P’s cut of 9 July 2026, so no hyperscaler is yet below it.
From The AI Compute Race. Read the book
- Falls due
- Read on
- The frozen cohort’s (row 12) newly evidenced gigawatts smaller in 2027 than in 2026, and smaller again in 2028. The cancellations row (30) voting distressed asset, cancellations dominating additions. A rating below investment grade from S&P or Moody’s on one of the five hyperscalers whose cash cover row 21 reads, or a missed payment on the bonds or loans of a neocloud, a cloud that rents out accelerators. A regulator’s or a court’s order to stop a datacenter’s operation, read on the order itself.
- Chapter
- Chapter 14 — The Convergence
One campus, Meta’s Hyperion, run through four possible futures to show how science, power, money and permission meet in the price of an accelerator-hour.
What it names
- Party Oracle
Add this test to your calendar · Download this test: CSV · JSON
How to cite this page
Dryburgh, Lee S. “Chapter 14, the movement downward, toward distress.” In The AI Compute Race. DRYBURGH. https://dryburgh.com/vol1/tests/2029-9 (accessed 2026-11-01).
BibTeX
@misc{dryburgh-chapter-14-the-movement-downward-toward--2026,
author = {Dryburgh, Lee S.},
title = {{Chapter 14, the movement downward, toward distress}},
howpublished = {In \emph{The AI Compute Race}, DRYBURGH},
year = {2026},
url = {https://dryburgh.com/vol1/tests/2029-9},
note = {Accessed 2026-11-01}
}