The AI Compute Race Tests Chapter 6, firm service is the constraint

Chapter 6, firm service is the constraint

Due

The test. Ten gigawatts of new datacenter load energized in the United States on connection terms that let the system curtail it, counted as the contracted interruptible megawatts at named sites and not as whole campuses, would weaken the claim. The same ten gigawatts energized at least twelve months before the transmission upgrades they were waiting for, on curtailed load rather than on generation or batteries brought to the site, would show that the constraint the chapter names was the wrong one, and withdraw the claim.

open Open. The public record holds neither count. The largest published figures are two of about a gigawatt (the demand-response capacity Google wrote into its contracts with five utilities and OpenAI’s up to 1,000 megawatts at its campus in Effingham County, Georgia, for power delivered in phases between 2028 and 2032), and neither is energized curtailable load.

From The AI Compute Race. Read the book

Falls due
Read on
The counts that utilities’ filings and state commissions’ dockets publish by that day
Chapter
Chapter 6 — Firm, Around-the-Clock

Where the electricity comes from: grid queues, transformers, turbines and the firm power a datacenter needs every hour of the year, on calendars the buildout does not control.

What it names

Filings that bear on it

Add this test to your calendar · Download this test: CSV · JSON

How to cite this page

Dryburgh, Lee S. “Chapter 6, firm service is the constraint.” In The AI Compute Race. DRYBURGH. https://dryburgh.com/vol1/tests/2028-12 (accessed 2026-11-01).

BibTeX

@misc{dryburgh-chapter-6-firm-service-is-the-constraint-2026,
  author = {Dryburgh, Lee S.},
  title = {{Chapter 6, firm service is the constraint}},
  howpublished = {In \emph{The AI Compute Race}, DRYBURGH},
  year = {2026},
  url = {https://dryburgh.com/vol1/tests/2028-12},
  note = {Accessed 2026-11-01}
}

For a reference manager: RIS · CSL-JSON