The AI Compute Race Tests Chapter 4, permanent power

Chapter 4, permanent power

Due

The test. Withdrawn if the records date the second substation’s entry into service on or before 31 December 2025, the end of the season the Chamber named. Weakened if they date it between 1 January and 11 February 2026, before TVA’s authorization. Confirmed if they date it after 11 February 2026.

open Open. No posted utility minute records the second substation entering service.

From The AI Compute Race. Read the book

Falls due
Read on
MLGW’s and TVA’s posted records
Chapter
Chapter 4 — One Rack

How a datacenter is actually built, from a converted factory in Memphis to a greenfield campus in Texas, and what the clock from first ground to first power really measures.

Filings that bear on it

Add this test to your calendar · Download this test: CSV · JSON

How to cite this page

Dryburgh, Lee S. “Chapter 4, permanent power.” In The AI Compute Race. DRYBURGH. https://dryburgh.com/vol1/tests/2026-5 (accessed 2026-11-01).

BibTeX

@misc{dryburgh-chapter-4-permanent-power-2026,
  author = {Dryburgh, Lee S.},
  title = {{Chapter 4, permanent power}},
  howpublished = {In \emph{The AI Compute Race}, DRYBURGH},
  year = {2026},
  url = {https://dryburgh.com/vol1/tests/2026-5},
  note = {Accessed 2026-11-01}
}

For a reference manager: RIS · CSL-JSON