The AI Compute Race Campuses Campus 31 of 40

Western Downs Digital Park (WDDP / Zerra DC), Kogan and Dalby, Queensland, Australia

WDDP / Zerra DC

Western Downs Digital Park (WDDP / Zerra DC; Kogan and Dalby, Queensland, Australia) has no dated promise on the record; at the end-of-August 2026 reading the public record evidences 0 MW of IT load. The book’s verdict: never dated.

From The AI Compute Race. Read the book

Download this campus: CSV · JSON

Announced or estimated (IT load)not on file
Evidenced power (IT load), end of August 20260 MW
The book’s verdictNever dated

The ledger’s reading is the end of August 2026: the promises and the states as they stood then. Each row’s evidence carries its own date, printed on it.

The promise and the record, on one line. The book’s verdict: Never dated.
  • Evidence read
  • Today

The announcement

Announced or estimated capacity (IT load)
not on file
Where the announcement was read
datacenterdynamics.com
When it was read

The promise

What was promised
none

At the close of the record

Evidenced power (IT load), end of August 2026
0 MW
Where the evidence was read
not on file
When it was read
The book’s verdict
Never dated

The book’s note

1,440 MW filed (a 2,200 MW press figure unverified), not IT. Four stages over four to six years, no dated phase. The August 2026 compilation records 0 publicly verified and names no source for the zero. The ABC reported on 16 Sep 2026, naming no source, that Anthropic, tenant of part of the park, aims to start using the centre in 2027; published after the August read, it is noted here and does not date the row, as SB Energy’s S-1 target does not re-date Milam.

Also

Who is involved

Questions about this campus

Is Western Downs Digital Park energized?
Western Downs Digital Park (WDDP / Zerra DC; Kogan and Dalby, Queensland, Australia) has no dated promise on the record; at the end-of-August 2026 reading the public record evidences 0 MW of IT load. The book’s verdict: never dated.
When was Western Downs Digital Park promised to be energized?
The record holds no dated promise for Western Downs Digital Park.
Who is building Western Downs Digital Park?
WDDP / Zerra DC (developer).
How to cite this page

Dryburgh, Lee S. “Western Downs Digital Park.” In The AI Compute Race. DRYBURGH. https://dryburgh.com/vol1/ledger/western-downs-digital-park (accessed 2026-11-01).

BibTeX

@misc{dryburgh-western-downs-digital-park-2026,
  author = {Dryburgh, Lee S.},
  title = {{Western Downs Digital Park}},
  howpublished = {In \emph{The AI Compute Race}, DRYBURGH},
  year = {2026},
  url = {https://dryburgh.com/vol1/ledger/western-downs-digital-park},
  note = {Accessed 2026-11-01}
}

For a reference manager: RIS · CSL-JSON