The AI Compute Race Campuses Campus 25 of 40

ByteDance (TikTok) Pecém (Omnia facility; ByteDance sole client; Casa dos Ventos power), Pecém, Ceará, Brazil

Omnia (Pátria) facility; ByteDance sole client; Casa dos Ventos power

ByteDance (TikTok) Pecém (Omnia facility, ByteDance sole client and Casa dos Ventos power; Pecém, Ceará, Brazil) was promised operations by 31 January 2027; at the end-of-August 2026 reading the public record evidences 0 MW of IT load. The book’s verdict: not yet due.

From The AI Compute Race. Read the book

Download this campus: CSV · JSON

Announced or estimated (IT load)not on file
Evidenced power (IT load), end of August 20260 MW
The book’s verdictNot yet due

The ledger’s reading is the end of August 2026: the promises and the states as they stood then. Each row’s evidence carries its own date, printed on it.

The promise and the record, on one line. The book’s verdict: Not yet due.
  • Evidence read
  • Today
  • Promised

The announcement

Announced or estimated capacity (IT load)
not on file
Where the announcement was read
reuters.com
When it was read

The promise

Promised by
What was promised
operations
Where the promise was read
not on file

At the close of the record

Evidenced power (IT load), end of August 2026
0 MW
Where the evidence was read
not on file
When it was read
The book’s verdict
Not yet due

The book’s note

Operations slated for January 2027 (the August 2026 compilation, from fDi, no URL); Reuters later gave first operation in Q3 2027, a revision before maturity. The August 2026 compilation records 0 publicly verified and names no source for the zero. The 200 MW (IT) this row carried until 16 October 2026 rested on no held document: the Reuters report of 18 May 2026 gives no megawatt figure for the data centre, and the compilation’s fDi source is not held. The Financial Times of 22 April 2026 gives “the data centre’s 300 megawatt electricity consumption” as power, “according to developers” (ft.com).

Also

Who is involved

Questions about this campus

Is ByteDance (TikTok) Pecém energized?
ByteDance (TikTok) Pecém (Omnia facility, ByteDance sole client and Casa dos Ventos power; Pecém, Ceará, Brazil) was promised operations by 31 January 2027; at the end-of-August 2026 reading the public record evidences 0 MW of IT load. The book’s verdict: not yet due.
When was ByteDance (TikTok) Pecém promised to be energized?
ByteDance (TikTok) Pecém was promised operations by 31 January 2027.
Who is building ByteDance (TikTok) Pecém?
Omnia (Pátria) (owner), ByteDance (tenant), Casa dos Ventos (power supplier).
How to cite this page

Dryburgh, Lee S. “ByteDance (TikTok) Pecém.” In The AI Compute Race. DRYBURGH. https://dryburgh.com/vol1/ledger/bytedance-tiktok-pecem (accessed 2026-11-01).

BibTeX

@misc{dryburgh-bytedance-tiktok-pece-m-2026,
  author = {Dryburgh, Lee S.},
  title = {{ByteDance (TikTok) Pecém}},
  howpublished = {In \emph{The AI Compute Race}, DRYBURGH},
  year = {2026},
  url = {https://dryburgh.com/vol1/ledger/bytedance-tiktok-pecem},
  note = {Accessed 2026-11-01}
}

For a reference manager: RIS · CSL-JSON