description: "Stargate Korea (two sites): never dated. 0 MW evidenced of 20 MW announced or estimated, end of August 2026 reading; no dated promise."
---

# Stargate Korea (two sites) (Samsung and SK; OpenAI), South Korea (sites not verified)

Samsung and SK; OpenAI

Stargate Korea (two sites) (Samsung and SK and OpenAI; South Korea (sites not verified)) has no dated promise on the record; at the end-of-August 2026 reading the public record evidences 0 MW of IT load against 20 MW announced or estimated. The book’s verdict: never dated.

From *The AI Compute Race*. [Read the book](https://dryburgh.com/vol1#buy)

Download this campus: [CSV](https://dryburgh.com/vol1/data/ledger-stargate-korea-two-sites.csv) · [JSON](https://dryburgh.com/vol1/data/ledger-stargate-korea-two-sites.json)

Announced or estimated (IT load) 20 MW

Evidenced power (IT load), end of August 2026 0 MW

The book’s verdict Never dated

The ledger’s reading is the end of August 2026: the promises and the states as they stood then. Each row’s evidence carries its own date, printed on it.

The promise and the record, on one line. The book’s verdict: **Never dated**.

- Evidence read 29 August 2026
- Today Nov 2026

**0 MW** evidenced at the end-of-August 2026 reading, of 20 MW announced or estimated (0%).

## The announcement

**Announced or estimated capacity (IT load):** 20 MW

**Where the announcement was read:** [openai.com](https://openai.com/index/samsung-and-sk-join-stargate/)

**When it was read:** 1 October 2025

## The promise

**What was promised:** none

## At the close of the record

**Evidenced power (IT load), end of August 2026:** 0 MW

**Where the evidence was read:** not on file

**When it was read:** 29 August 2026

**The book’s verdict:** Never dated

## The book’s note

20 MW may be per site (40 MW), unresolved. The only date given was a construction start in March 2026, not first power or operations; the minister later said timing was undecided. The August 2026 compilation records 0 publicly verified and names no source for the zero.

## Also

**Who is involved:**

- partner [Samsung](https://dryburgh.com/vol1/parties/samsung)
- partner [SK](https://dryburgh.com/vol1/parties/sk)
- partner [OpenAI](https://dryburgh.com/vol1/parties/openai)

## Campuses near it in the ledger

- [PORTS-Pike](https://dryburgh.com/vol1/ledger/ports-pike) shares a party
- [Stargate Doña Ana / Project Jupiter](https://dryburgh.com/vol1/ledger/stargate-dona-ana-project-jupiter) shares a party
- [Stargate Shackelford / Frontier](https://dryburgh.com/vol1/ledger/stargate-shackelford-frontier) shares a party
- [Stargate UAE](https://dryburgh.com/vol1/ledger/stargate-uae) shares a party
- [Stargate Michigan / The Barn](https://dryburgh.com/vol1/ledger/stargate-michigan-the-barn) shares a party
- [Stargate Port Washington / Lighthouse](https://dryburgh.com/vol1/ledger/stargate-port-washington-lighthouse) shares a party

## Questions about this campus

**Is Stargate Korea (two sites) energized?:** Stargate Korea (two sites) (Samsung and SK and OpenAI; South Korea (sites not verified)) has no dated promise on the record; at the end-of-August 2026 reading the public record evidences 0 MW of IT load against 20 MW announced or estimated. The book’s verdict: never dated.

**When was Stargate Korea (two sites) promised to be energized?:** The record holds no dated promise for Stargate Korea (two sites).

**Who is building Stargate Korea (two sites)?:** Samsung (partner), SK (partner), OpenAI (partner).

- [Tests](https://dryburgh.com/vol1/tests)
- [Scorecard](https://dryburgh.com/vol1/scorecard)
- [Data](https://dryburgh.com/vol1/data/releases)
- [Chapter by chapter](https://dryburgh.com/vol1/companion)
- [The record at a glance](https://dryburgh.com/vol1/observatory)
- [The machine](https://dryburgh.com/vol1/machine)
- [One campus, four futures](https://dryburgh.com/vol1/hyperion)
- [Glossary](https://dryburgh.com/vol1/glossary)
- [People](https://dryburgh.com/vol1/people)
- [Sources](https://dryburgh.com/vol1/sources)
- [Notes](https://dryburgh.com/vol1/notes)
- [Where the book was wrong](https://dryburgh.com/vol1/corrections)
- [Where its sources were wrong](https://dryburgh.com/corrections?book=vol1)
- [The Paper](https://dryburgh.com/vol1/paper)
- [Consent](https://dryburgh.com/vol1/consent)
- [Who builds and pays](https://dryburgh.com/vol1/parties)

*The AI Compute Race: Five Races, One Machine* is a book by Lee S. Dryburgh, the first volume of THE COMPUTE ECONOMY, published by Dryburgh, an imprint of Contestra OÜ, Tallinn, Estonia; its record closes on 8 November 2026.

[About the book](https://dryburgh.com/vol1)[Tell me when it is out](https://dryburgh.com/vol1#notify)