---
title: "Reliance Digital Connexion Visakhapatnam (Digital Connexion), Visakhapatnam, Andhra Pradesh, India — campus ledger — The AI Compute Race — DRYBURGH · The Compute Economy"
source: https://dryburgh.com/vol1/ledger/reliance-digital-connexion-visakhapatnam
description: "Reliance Digital Connexion Visakhapatnam: never dated. 0 MW evidenced, end of August 2026 reading; no dated promise."
---

# Reliance Digital Connexion Visakhapatnam (Digital Connexion), Visakhapatnam, Andhra Pradesh, India

Digital Connexion (Reliance, Brookfield, Digital Realty)

Reliance Digital Connexion Visakhapatnam (Digital Connexion; Visakhapatnam, Andhra Pradesh, India) has no dated promise on the record; at the end-of-August 2026 reading the public record evidences 0 MW of IT load. The book’s verdict: never dated.

From *The AI Compute Race*. [Read the book](https://dryburgh.com/vol1#buy)

Download this campus: [CSV](https://dryburgh.com/vol1/data/ledger-reliance-digital-connexion-visakhapatnam.csv) · [JSON](https://dryburgh.com/vol1/data/ledger-reliance-digital-connexion-visakhapatnam.json)

Announced or estimated (IT load) not on file

Evidenced power (IT load), end of August 2026 0 MW

The book’s verdict Never dated

The ledger’s reading is the end of August 2026: the promises and the states as they stood then. Each row’s evidence carries its own date, printed on it.

The promise and the record, on one line. The book’s verdict: **Never dated**.

- Evidence read 29 August 2026
- Today Nov 2026

## The announcement

**Announced or estimated capacity (IT load):** not on file

**Where the announcement was read:** [reuters.com](https://www.reuters.com/world/india/indias-reliance-industries-jv-invest-11-billion-data-centre-2025-11-26/)

**When it was read:** 26 November 2025

## The promise

**What was promised:** none

## At the close of the record

**Evidenced power (IT load), end of August 2026:** 0 MW

**Where the evidence was read:** not on file

**When it was read:** 29 August 2026

**The book’s verdict:** Never dated

## The book’s note

1,000 MW campus capacity, not IT; no completion date. The August 2026 compilation records 0 publicly verified and names no source for the zero.

## Also

**Who is involved:**

- developer [Digital Connexion](https://dryburgh.com/vol1/parties/digital-connexion)
- partner [Reliance](https://dryburgh.com/vol1/parties/reliance)
- partner [Brookfield](https://dryburgh.com/vol1/parties/brookfield)
- partner [Digital Realty](https://dryburgh.com/vol1/parties/digital-realty)

## Campuses near it in the ledger

- [Google Visakhapatnam AI hub](https://dryburgh.com/vol1/ledger/google-visakhapatnam-ai-hub) Andhra Pradesh, India
- [Paducah AI/HPC campus](https://dryburgh.com/vol1/ledger/paducah-ai-hpc-campus) shares a party

## Questions about this campus

**Is Reliance Digital Connexion Visakhapatnam energized?:** Reliance Digital Connexion Visakhapatnam (Digital Connexion; Visakhapatnam, Andhra Pradesh, India) has no dated promise on the record; at the end-of-August 2026 reading the public record evidences 0 MW of IT load. The book’s verdict: never dated.

**When was Reliance Digital Connexion Visakhapatnam promised to be energized?:** The record holds no dated promise for Reliance Digital Connexion Visakhapatnam.

**Who is building Reliance Digital Connexion Visakhapatnam?:** Digital Connexion (developer), Reliance (partner), Brookfield (partner), Digital Realty (partner).

- [Tests](https://dryburgh.com/vol1/tests)
- [Scorecard](https://dryburgh.com/vol1/scorecard)
- [Data](https://dryburgh.com/vol1/data/releases)
- [Chapter by chapter](https://dryburgh.com/vol1/companion)
- [The record at a glance](https://dryburgh.com/vol1/observatory)
- [The machine](https://dryburgh.com/vol1/machine)
- [One campus, four futures](https://dryburgh.com/vol1/hyperion)
- [Glossary](https://dryburgh.com/vol1/glossary)
- [People](https://dryburgh.com/vol1/people)
- [Sources](https://dryburgh.com/vol1/sources)
- [Notes](https://dryburgh.com/vol1/notes)
- [Where the book was wrong](https://dryburgh.com/vol1/corrections)
- [Where its sources were wrong](https://dryburgh.com/corrections?book=vol1)
- [The Paper](https://dryburgh.com/vol1/paper)
- [Consent](https://dryburgh.com/vol1/consent)
- [Who builds and pays](https://dryburgh.com/vol1/parties)

*The AI Compute Race: Five Races, One Machine* is a book by Lee S. Dryburgh, the first volume of THE COMPUTE ECONOMY, published by Dryburgh, an imprint of Contestra OÜ, Tallinn, Estonia; its record closes on 8 November 2026.

[About the book](https://dryburgh.com/vol1)[Tell me when it is out](https://dryburgh.com/vol1#notify)
