# IREN Sweetwater (IREN), Sweetwater County, Texas, US (as the August 2026 compilation gives it)

IREN

IREN Sweetwater (IREN; Sweetwater County, Texas, US (as the August 2026 compilation gives it)) has no dated promise on the record; at the end-of-August 2026 reading the public record evidences 0 MW of IT load. The book’s verdict: never dated.

From *The AI Compute Race*. [Read the book](https://dryburgh.com/vol1#buy)

Download this campus: [CSV](https://dryburgh.com/vol1/data/ledger-iren-sweetwater.csv) · [JSON](https://dryburgh.com/vol1/data/ledger-iren-sweetwater.json)

Announced or estimated (IT load) not on file

Evidenced power (IT load), end of August 2026 0 MW

The book’s verdict Never dated

The ledger’s reading is the end of August 2026: the promises and the states as they stood then. Each row’s evidence carries its own date, printed on it.

The promise and the record, on one line. The book’s verdict: **Never dated**.

- Evidence read 27 August 2026
- Today Nov 2026

## The announcement

**Announced or estimated capacity (IT load):** not on file

**Where the announcement was read:** [globenewswire.com](https://www.globenewswire.com/news-release/2026/08/27/3352401/0/en/iren-reports-fy26-results.html)

**When it was read:** 27 August 2026

## The promise

**What was promised:** none

## At the close of the record

**Evidenced power (IT load), end of August 2026:** 0 MW

**Where the evidence was read:** [globenewswire.com](https://www.globenewswire.com/news-release/2026/08/27/3352401/0/en/iren-reports-fy26-results.html)

**When it was read:** 27 August 2026

**The book’s verdict:** Never dated

## The book’s note

2,000 MW of grid rights, not IT; the substation is live but no AI IT load is attributed. AI delivery ‘2027 onward’ with no site date (the August 2026 compilation), so no scorable promise. The August 2026 compilation’s ‘Sweetwater County, Texas’ is unsettled: Texas has no county of that name, and IREN’s own site filing would give the county.

## Also

**Who is involved:**

- owner [IREN](https://dryburgh.com/vol1/parties/iren)

## Filings that bear on it

- [IREN Limited, Form 10-K for the fiscal year ended 30 June 2026, filed 27 August 2026](https://dryburgh.com/vol1/filings/iren-10k-fy26) IREN’s annual report for the year to June 2026 shows a five-year, $9.7 billion Microsoft contract, a $3.4 billion cloud contract with NVIDIA, and $1.2 billion of GPU financing with Blue Owl Capital as agent.

## Questions about this campus

**Is IREN Sweetwater energized?:** IREN Sweetwater (IREN; Sweetwater County, Texas, US (as the August 2026 compilation gives it)) has no dated promise on the record; at the end-of-August 2026 reading the public record evidences 0 MW of IT load. The book’s verdict: never dated.

**When was IREN Sweetwater promised to be energized?:** The record holds no dated promise for IREN Sweetwater.

**Who is building IREN Sweetwater?:** IREN (owner).

- [Tests](https://dryburgh.com/vol1/tests)
- [Scorecard](https://dryburgh.com/vol1/scorecard)
- [Data](https://dryburgh.com/vol1/data/releases)
- [Chapter by chapter](https://dryburgh.com/vol1/companion)
- [The record at a glance](https://dryburgh.com/vol1/observatory)
- [The machine](https://dryburgh.com/vol1/machine)
- [One campus, four futures](https://dryburgh.com/vol1/hyperion)
- [Glossary](https://dryburgh.com/vol1/glossary)
- [People](https://dryburgh.com/vol1/people)
- [Sources](https://dryburgh.com/vol1/sources)
- [Notes](https://dryburgh.com/vol1/notes)
- [Where the book was wrong](https://dryburgh.com/vol1/corrections)
- [Where its sources were wrong](https://dryburgh.com/corrections?book=vol1)
- [The Paper](https://dryburgh.com/vol1/paper)
- [Consent](https://dryburgh.com/vol1/consent)
- [Who builds and pays](https://dryburgh.com/vol1/parties)

*The AI Compute Race: Five Races, One Machine* is a book by Lee S. Dryburgh, the first volume of THE COMPUTE ECONOMY, published by Dryburgh, an imprint of Contestra OÜ, Tallinn, Estonia; its record closes on 8 November 2026.

[About the book](https://dryburgh.com/vol1)[Tell me when it is out](https://dryburgh.com/vol1#notify)